POWER & COGENERATION PROJECT SUCCESS
ENMAX RELIABILITY ANALYSIS FOR DISTRICT EDMONTON
Executed Reliability, Availability, Maintainability (RAM) Analysis at Plant DES Edmonton Project to calculate the Level of Service for DES Edmonton by estimating the probability that this facility will produce a specified thermal energy capacity of hot water for the stated boiler and Combined Heat and Power Plant (CHP) configurations. Determined Cost of Ownership Analysis (COA) for boiler and CHP configuration cases.
ENMAX PRODUCTION-AVAILABILITY MODEL FOR PLANT DE9A
Executed Production-Availability Model/ Reliability Assessment to determine Operational Availability of an under-utilized existing facility to produce full capacity of hot water, and to determine the probability that each relevant capacity output level will be met or exceeded during winter.
SHELL ALBIAN POWER DISTRIBUTION UPGRADE PROJECT RAM STUDY
Executed a Reliability, Availability, Maintainability (RAM) Analysis for the MRM Power Distribution Upgrade Project for both the Select and Define Phase. The analysis considered a new 260kV substation, a 25kV GIS substation, and a 72 kV sub-transmission line system, and the associated operating philosophy.
IMPERIAL OIL ASPEN STEAM TRAIN & COGENERATION PLANT RAM STUDY
Executed a Reliability, Availability, Maintainability (RAM) Analysis to evaluate the Availability of the steam train and cogeneration plant. This analysis was executed in the Optimization Phase of the Project.
IMPERIAL OIL NABIYE CYCLIC STEAM STIMULATION (CSS) FACILITY RAM STUDY
Executed a Reliability Availability Maintainability (RAM) & Capacity Analysis to assess the Availability and provide input to the Reliability & Maintainability Philosophy for the Nabiye CSS Facility (well pads and central processing plant) during the Front End Engineering Design (FEED) Phase.