IN-SITU OIL SANDS PROJECT SUCCESS
IMPERIAL OIL ASPEN SAGD CPF RAM STUDY
Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability of various process configuration options for the Imperial Oil Aspen Steam Assisted Gravity Drainage (SAGD) Central Processing Facility (CPF). This analysis was executed in the Optimization Phase of the project.
HUSKY SUNRISE PHASES 1 AND 2A PROJECT RAM STUDY
Executed a Reliability Availability Maintainability (RAM) Analysis to validate the plant Availability and assess production debottlenecking options. The study accurately reflects the detailed engineering design of the Sunrise project, inclusive of Sunrise operations and maintenance strategies.
NEXEN KINOSIS SAGD INFRASTRUCTURE PROJECT RAM STUD
Executed a Reliability Availability & Maintainability (RAM) Analysis in the Select Stage for the Long Lake Diluent Tank Project.
SHELL CARMON CREEK PROJECT CASTING VENT GAS (CVG) AND EMULSION PIPELINE INTEGRITY THREAT ASSESSMENT
Conducted a study for the Shell Carmon Creek (CCK) Project to assess the Casting Vent Gas (CVG) and emulsion pipeline integrity threats and propose associated mitigation protocols. Scope of the study included: Computational Fluid Dynamics (CFD) to assess water accumulation in the CVG Line and sediment settling in the emulsion Line, corrosion simulation, topography mapping, risk assessment, and design modifications.
CANADIAN NATURAL RESOURCES LIMITED (CNRL) KIRBY NORTH (KN1 & KN2 PHASES) RAM STUDY
Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability impact of the pre-investment options.
HUSKY-BP SUNRISE EXPANSION PRE-DBM RAM STUDY
Executed Sunrise Phase 2+ Project Conceptual Reliability Availability Maintainability (RAM) Analysis to validate the plant Availability and evaluate optimum CAPEX investment.
CANADIAN NATURAL RESOURCES LIMITED (CNRL) KIRBY SOUTH CENTRAL PLANT (KCP) RAM STUDY
Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability of various process configuration options for the Imperial Oil Aspen Steam Assisted Gravity Drainage (SAGD) Central Processing Facility (CPF). This analysis was executed in the Optimization Phase of the project.
IMPERIAL OIL NABIYE CYCLIC STEAM STIMULATION (CSS) FACILITY RAM STUDY
Executed a Reliability Availability Maintainability (RAM) & Capacity Analysis to assess the Availability and provide input to the Reliability & Maintainability Philosophy for the Nabiye CSS Facility (well pads and central processing plant) during the Front End Engineering Design (FEED) Phase.