PRODUCTION & MIDSTREAM PROJECT SUCCESS

TRANS NORTHERN PIPELINE LTD. PRODUCTION AVAILABILITY MODELING

Executed a Production-Availability Model/ Reliability Assessment for a new 12” 300 km Pipeline, existing pumping stations, and associated facilities to estimate the Availability of the pipeline to deliver refined products to market over the next 10 years without upgrades to pumping stations.

TALISMAN ENERGY INC. RAM STUDY

Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability of the SITUCHE Central Development (light oil) Project.

ENCANA ENERGY CORPORATION PIPELINE CORROSION INVESTIGATION

Executed the following for EnCana’s Pipeline 30401 – 4, 5, 6, 11, 7 in the Wainwright West Area: identification of the corrosion mechanism(s); recommendations to mitigate existing corrosion damage.

ENCANA ENERGY CORPORATION PIPELINE FAILURE INVESTIGATION

Investigated EnCana’s Line #4 Location: 1-3-47-10W4 failure and provided a complete written integrity assessment of the pipeline system and plan to prevent any further failures. This plan considered the pipeline condition, extent of corrosion, product carried, population density, environmental and public risk, and proposed mitigation and operational changes necessary to prevent further failures.

ENERPLUS NESTOW GAS PLANT CORROSION INVESTIGATION

Investigated and provided mitigation recommendations for the corrosion problems that were experienced within the lean/rich MEA amine plate exchanger and within the lean MEA amine booster pump in the Nestow Gas Plant.