PROJECT RAM STUDY
Executed a Reliability Availability Maintainability (RAM) Analysisto validate the plant Availability and assess production debottlenecking options. The study accurately reflects the detailed engineering design of the Sunrise project, inclusive of Sunrise operations and maintenance strategies.
RAM STUDY
Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability of various process configuration options for the Imperial Oil Aspen Steam Assisted Gravity Drainage (SAGD) Central Processing Facility (CPF). This analysis was executed in the Optimization Phase of the project.
PROJECT RAM STUDY
Executed a Reliability Availability & Maintainability (RAM) Analysis in the Select Stage for the Long Lake Diluent Tank Project.
KIRBY SOUTH CENTRAL PLANT (KCP) RAM STUDY
Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability of various process configuration options for the Imperial Oil Aspen Steam Assisted Gravity Drainage (SAGD) Central Processing Facility (CPF). This analysis was executed in the Optimization Phase of the project.
FACILITY RAM STUDY
Executed a Reliability Availability Maintainability (RAM) & Capacity Analysis to assess the Availability and provide input to the Reliability & Maintainability Philosophy for the Nabiye CSS Facility (well pads and central processing plant) during the Front End Engineering Design (FEED) Phase.
KIRBY NORTH (KN1 & KN2 PHASES) RAM STUDY
Executed a Reliability Availability Maintainability (RAM) & Capacity Analysis to assess the Availability and provide input to the Reliability & Maintainability Philosophy for the Nabiye CSS Facility (well pads and central processing plant) during the Front End Engineering Design (FEED) Phase.
CASTING VENT GAS (CVG) AND EMULSION PIPELINE INTEGRITY THREAT ASSESSMENT
Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability of various process configuration options for the Imperial Oil Aspen Steam Assisted Gravity Drainage (SAGD) Central Processing Facility (CPF). This analysis was executed in the Optimization Phase of the project.
PRE-DBM RAM STUDY
Executed Sunrise Phase 2+ Project Conceptual Reliability Availability Maintainability (RAM) Analysis to validate the plant **Availability** and evaluate optimum CAPEX investment.